THE BRIEF
The client required a full redesign andupgrade of an existing bathroomand adjoining study to improve accessibility, future-proof the space,and enhance everyday functionality. The original layout was cramped,dated, and not suitable for the client’s long-term mobility needs.
The project presented several challenges:
- Integrating NDIS accessibility requirements within a compact footprint
- Managing asbestos considerations
- Coordinating structural alterations to accommodate the new layout
- Working within an occupied home while minimising disruption to the client’s daily life
In addition, the client requested an enhanced layout featuring a freestanding bath positioned under a new window, upgraded fixtures, improved lighting and ventilation, and wall reinforcements for future grab rails. Several design adjustments were made during pre-construction as the client refined their layout and fixture selections.
OUR APPROACH
J&D Contracting delivered a highly coordinated and methodical build, combining accessibility compliance with a strong focus on detail and communication.
During the project, J&D Contracting:
- Coordinated asbestos testing and arranged safe removal of asbestos tiles and linings
- Reconfigured the floor plan by removing the study to create a larger, open wet-area bathroom compliant with NDIS design principles
- Removed existing bathroom fixtures, toilet, shower recess, study walls, and linings
- Supplied and installed a new 1020mm cavity slider to improve accessibility and circulation
- Installed a new aluminium window centred over the bath with laminated safety glass
- Completed structural framing alterations to suit the new layout, cabinetry recesses, shower nib wall, and cavity slider
- Installed new FC underlay, villa-board, tiled areas, and Hardie Groove feature linings
- Provided ply reinforcement to walls between 600–1800mm AFL for future grab-rail installation
- Completed full AS3740 waterproofing with Form 43 certification
- Installed new R10 floor tiles, full-height and partial-height wall tiles, and all selected fixtures
- Upgraded electrical components, including new downlights, GPOs in cabinetry, and reinstatement of the existing fan/light unit in compliance with AS3000
- Coordinated plumbing relocations, including new wastes for the shower, bath, and relocated toilet
- Maintained consistent communication with the client throughout, providing updates on selections, scheduling, and progress
- Provided a full clean, defect review, and handover on completion